Scope of Civil Work
What is included in the Grey Structure Package?
Excavation & Footing
Deep soil excavation, anti-termite treatment, and double-mesh footing for stability.
RCC Framework
Columns, Beams, and Roof Slabs cast with M20/M25 grade machine-mixed concrete.
Brickwork
Red Brick (Class A) or Fly Ash masonry with strict vertical alignment (plumb check).
Plastering
Double coat external plaster and smooth internal plaster with chicken mesh at joints.
Engineering Standards
M25
Concrete GradeFe550
TMT Steel Grade1:4
Mortar Ratio43Gr
Cement GradeConstruction Sequence
Layout & Excavation
Marking the plot according to Naksha Ghar's plan. Excavating soil for foundation footings.
Plinth & DPC
Casting the Plinth Beam to tie columns together. Adding Damp Proof Course (DPC) to prevent seepage.
Superstructure (RCC)
Erecting columns and casting the roof slab using shuttering and vibration machines.
Masonry & Curing
Brick walls are raised. Continuous water curing for 21 days to ensure concrete strength.
Approved Brands
| Material | Brands We Use | Specification |
|---|---|---|
| Cement | Ultratech, ACC, Lafarge | PPC / OPC 43/53 Grade |
| Steel (TMT) | Tata Tiscon, Jindal Panther, Kamdhenu | Fe 550 SD (Earthquake Resistant) |
| Bricks | Local Kiln (No. 1 Red) / Fly Ash | High Compressive Strength |
| Waterproofing | Dr. Fixit, Fosroc | Admixture in Concrete |
Quality Assurance
Cube Testing
Concrete samples tested in lab for strength.
Plumb Check
Ensuring walls are perfectly 90-degree vertical.
Silt Test
Checking sand purity before mixing.
Slump Test
Verifying water-cement ratio on site.
INCLUDED (Civil)
- Foundation & Footing
- Columns, Beams, Slab
- Brick Walls
- Internal & External Plaster
- Septic Tank Structure
- Overhead Tank Structure
EXCLUDED (Finishing)
- Flooring (Tiles/Marble)
- Painting & Putty
- Electrical Wiring
- Plumbing Fittings
- Doors & Windows
STRUCTURE COST ESTIMATOR
*Approximate estimation for Grey Structure only.
RISING CONSTRUCTION • CIVIL WING
STRONG FOUNDATIONS
Precision Engineering. Grade A Materials. 100% Solid Structure.
ESTIMATE STRUCTURAL COSTThe Skeleton Matters
Paint can be changed. Tiles can be replaced. But the Structure (Civil Work) is permanent.
At Rising Construction, we treat Civil Work as the most critical phase. We don't just stack bricks; we engineer a load-bearing skeleton capable of withstanding earthquakes and time.
Scope of Civil Work
What is included in the Grey Structure Package?
Excavation & Footing
Deep soil excavation, anti-termite treatment, and double-mesh footing for stability.
RCC Framework
Columns, Beams, and Roof Slabs cast with M20/M25 grade machine-mixed concrete.
Brickwork
Red Brick (Class A) or Fly Ash masonry with strict vertical alignment (plumb check).
Plastering
Double coat external plaster and smooth internal plaster with chicken mesh at joints.
Engineering Standards
M25
Concrete GradeFe550
TMT Steel Grade1:4
Mortar Ratio43Gr
Cement GradeConstruction Sequence
Layout & Excavation
Marking the plot according to Naksha Ghar's plan. Excavating soil for foundation footings.
Plinth & DPC
Casting the Plinth Beam to tie columns together. Adding Damp Proof Course (DPC) to prevent seepage.
Superstructure (RCC)
Erecting columns and casting the roof slab using shuttering and vibration machines.
Masonry & Curing
Brick walls are raised. Continuous water curing for 21 days to ensure concrete strength.
Approved Brands
| Material | Brands We Use | Specification |
|---|---|---|
| Cement | Ultratech, ACC, Lafarge | PPC / OPC 43/53 Grade |
| Steel (TMT) | Tata Tiscon, Jindal Panther, Kamdhenu | Fe 550 SD (Earthquake Resistant) |
| Bricks | Local Kiln (No. 1 Red) / Fly Ash | High Compressive Strength |
| Waterproofing | Dr. Fixit, Fosroc | Admixture in Concrete |
Quality Assurance
Cube Testing
Concrete samples tested in lab for strength.
Plumb Check
Ensuring walls are perfectly 90-degree vertical.
Silt Test
Checking sand purity before mixing.
Slump Test
Verifying water-cement ratio on site.
INCLUDED (Civil)
- Foundation & Footing
- Columns, Beams, Slab
- Brick Walls
- Internal & External Plaster
- Septic Tank Structure
- Overhead Tank Structure
EXCLUDED (Finishing)
- Flooring (Tiles/Marble)
- Painting & Putty
- Electrical Wiring
- Plumbing Fittings
- Doors & Windows